JMF Concrete Co. Call (423) 314-0968

Home  /  Services  /  Structural Slabs

Service

Concrete slabs for garages, shops, barns & pavilions

Slab-on-grade built for what goes on it — compacted base, vapor barrier where it belongs, a real rebar grid, thickened edges, and a finish that matches the use.

A building slab has one job: stay flat and stay put under load, for decades. The difference between a slab that does that and one that cracks and heaves is all in the prep — the base, the moisture control, and the steel. JMF Concrete Co. pours slabs across Greater Chattanooga and North Georgia for garages, shops, agricultural buildings, and light commercial.

What we pour

  • Attached and detached garage slabs
  • Shop, workshop, and hobby-building floors
  • Pole-barn and metal-building slabs
  • Pavilion, carport, and outdoor-structure pads
  • Equipment, generator, and tank pads
  • Agricultural and storage-building floors

How we build a slab

  • Strip and grade. Topsoil off, cut to grade, and undercut any soft or organic spots.
  • Base. Compacted crusher-run, typically 4", proof-rolled before anything goes on it.
  • Vapor barrier. 10–15 mil poly under enclosed or heated buildings and anything getting flooring.
  • Steel. #4 rebar grid on chairs at 16" on center, or engineered fiber for lighter pads.
  • Thickened edges. Turn-downs at perimeter walls and door openings where the load concentrates.
  • Placement. 4" for cars, 5–6" and 3,500–4,000 PSI for shops and equipment.
  • Finish. Steel-trowel for a hard, smooth interior floor; broom for exterior and traction.
  • Joints. Sawcut control joints on the right grid so the slab cracks where you can't see it.

Coordination before the pour

Under-slab plumbing and electrical sleeves, anchor bolts, and equipment embeds all get set and checked before concrete. If you're building the structure too, see foundations & footings.

Common questions

Do I need a vapor barrier?
Yes for enclosed, heated, or floored buildings. It stops ground moisture wicking up through the slab.
Rebar or fiber?
Rebar grid plus thickened edges for anything carrying vehicles or equipment. Fiber is fine for lighter unenclosed pads.
How thick for a shop?
5–6" with a stronger mix if you'll run a lift, trailers, or a tractor. 4" for a standard car garage.
Can you match an existing slab?
Yes — we dowel into it so the two move together, and match elevation and finish as close as the old slab allows.
Fresh concrete slab poured under a timber-frame pavilion with a metal roof near Chattanooga
Pavilion slab — base, steel, broom finish

Building a shop or garage?